Methods and data
Which methods Attenix calculates, in which editions; what goes in and what comes out; how to run the engine without Studio; how fast it is; and what it does not cover.
The methods it calculates
A calculation method is a module. Each module has an edition per text of the regulation it implements, and each edition has its own implementation version. A result always states which of them produced it.
| Source | Dutch methods | European method |
|---|---|---|
| Road traffic | Omgevingsregeling, Bijlage IVe (2024 and 2026-07); RMG 2012, SRM II, which the transitional law keeps for provincial roads and industrial estates | CNOSSOS-EU road, with the Dutch Bijlage XXXIII |
| Railway and tram | Bijlage IVf (2024 and 2026-07), with steel bridges and the standing trains by Bijlage IVh | CNOSSOS-EU rail, with the Dutch Bijlage XXXIII |
| Industry | Bijlage IVh (2024 and 2026-07), model II.8 and method I, with LAmax | CNOSSOS-EU industry, with the Dutch Bijlage XXXIII |
For road traffic in the Netherlands the engine implements both texts of the Omgevingsregeling, Bijlage IVe that apply in 2026: the text in force from 2024-01-01 to 2026-06-30 and the amended text in force from 2026-07-01. It also implements Standaardrekenmethode 2 of the Reken- en meetvoorschrift geluid 2012, which the transitional law keeps for provincial roads and industrial estates; the road lanes of both Dutch methods share one set of attributes, so one study can be calculated with either. For railway and tram traffic in the Netherlands it implements both texts of Bijlage IVf that apply in 2026, with steel bridges; the standing trains are calculated by Bijlage IVh in the same run. For industry in the Netherlands it implements both texts of Bijlage IVh that apply in 2026, with method I for sources close to the receiver. For the European method it implements CNOSSOS-EU (Directive (EU) 2015/996 and its amendment by Delegated Directive (EU) 2021/1226) for road traffic, railway traffic and industry, each with the Dutch adaptation of Bijlage XXXIII.
| Module and edition | Method | Status |
|---|---|---|
nl-omgr-ive@2026-07 |
Omgevingsregeling, Bijlage IVe (road traffic), text in force from 2026-07-01, chapters 2 and 5 to 7 | Released |
nl-omgr-ive@2024 |
Omgevingsregeling, Bijlage IVe, text in force 2024-01-01 to 2026-06-30, chapters 2 and 5 to 7 | Released |
nl-omgr-ivf@2026-07 |
Omgevingsregeling, Bijlage IVf (railway and tram traffic), text in force from 2026-07-01: tracks with the twelve Dutch vehicle categories on five source lines, with joints, switches, tram track, rail roughness and steel bridges; the standing trains are calculated with Bijlage IVh in the same run | Released |
nl-omgr-ivf@2024 |
Omgevingsregeling, Bijlage IVf, text in force 2024-01-01 to 2026-06-30; differs only in which standing trains are calculated | Released |
nl-omgr-ivh@2026-07 |
Omgevingsregeling, Bijlage IVh (industry), model II.8, text in force from 2026-07-01: point, line and area sources in nine octave bands from 31,5 Hz, with operating times, surcharges, directivity, vegetation, open installations, tanks and earth bodies; L_den and the maximum level L_Amax | Released |
nl-omgr-ivh@2024 |
Omgevingsregeling, Bijlage IVh, text in force 2024-01-01 to 2026-06-30; differs only in the procedure for several screens | Released |
nl-omgr-ivh-i@2026-07, @2024 |
Omgevingsregeling, Bijlage IVh, method I (§3.1): the simplified A-weighted calculation for point sources up to 150 m from the receiver, in both texts | Released |
nl-rmg2012-srm2@2023-12 |
Reken- en meetvoorschrift geluid 2012, Bijlage III, Standaardrekenmethode 2 (road traffic), its last text, which the transitional law keeps in force; chapters 2 and 5 to 7, with trams and RIVM’s Cwegdek road surfaces | Released |
cnossos-eu.propagation@2015-996 |
CNOSSOS-EU propagation, Directive (EU) 2015/996 §2.5, with the agreed readings of ISO/TR 17534-4 | Released |
cnossos-eu.propagation@2021-1226 |
CNOSSOS-EU propagation as amended by Delegated Directive (EU) 2021/1226 | Released |
cnossos-eu.road@2021-1226 |
CNOSSOS-EU road traffic noise, Directive 2002/49/EC Annex II §2.2, as amended by 2021/1226 | Released |
cnossos-eu.road.nl@2024 |
Dutch adaptation: Omgevingsregeling, Bijlage XXXIII (road traffic), in force from 2024-01-01 | Released |
cnossos-eu.road.nl@2027 |
Dutch adaptation with the tables RIVM proposes for 2027; a proposal, not the text in force, and every calculation with it records a warning | Proposal |
cnossos-eu.industry@2021-1226 |
CNOSSOS-EU industrial noise, Directive 2002/49/EC Annex II §2.4, as amended by 2021/1226: point, line and area sources, working hours per period and directivity | Released |
cnossos-eu.industry.nl@2024 |
Dutch adaptation: Omgevingsregeling, Bijlage XXXIII §2.4 (industry), in force from 2024-01-01, for the industry noise maps of the END delivery | Released |
cnossos-eu.rail@2021-1226 |
CNOSSOS-EU railway noise, Directive 2002/49/EC Annex II §2.3, as amended by 2021/1226: tracks with the vehicles of Appendix G; rolling, traction and aerodynamic noise, impact noise of joints, curve squeal, bridges and the reflections between a train and a nearby screen | Released |
cnossos-eu.rail.nl@2024 |
Dutch adaptation: Omgevingsregeling, Bijlage XXXIII §2.3 (railway traffic), in force from 2024-01-01: the Dutch vehicle categories and track types, and bridges by their surcharge | Released |
Data in and out, and the command-line tool
Studio calculates with the engine; the same engine runs on its own as the command-line tool
attenix, the calculation engine (rekenhart) of Attenix, on Windows and Linux, for
scripts, servers and large batches. Rekenhart is the Dutch field’s word for the program that
calculates a level by the prescribed method; RIVM’s Rekenhart geluid, with which Attenix is compared, is a
different program. How it works, and every command and option, is on the page
Command line.
The command-line tool imports a scene from a GeoPackage once and calculates it with the module edition and version you name; the path finder is the newest of the rule set the module requires, unless you name one. With the installed tool of the release 0.4.0:
$ attenix import input.gpkg scene.atxscene
$ attenix calculate scene.atxscene --module nl-omgr-ive@2026-07/1.5.0 \
--out results.gpkg
- GeoPackage exchange format: input and results are GeoPackage files in a versioned, documented schema that GIS software can open.
- Incremental recalculation: after an edit, only what the edit affects is calculated again, and the results equal those of a full calculation.
- Several methods in one run:
--modulecan be repeated, for example roads by Bijlage IVe and railway tracks by Bijlage IVf with their standing trains by Bijlage IVh. Each group of modules gets its own path finder, and the results keep the levels of each method next to their sum. - Runs, variants and grids: a study is calculated into a runs folder next to it, as Attenix
Studio does: each run keeps a copy of the study as calculated, its results and its manifest, and the next
calculation can build on it. Variants of a study and partial runs (chosen receivers, or an area) go into the
same folder. Receiver grids are refined where the levels change, and
attenix contoursdraws their contours.attenix combineadds finished runs of the same receivers, andattenix comparewrites the difference of two runs. - Signed module packages: calculation methods are installed as signed packages; the tool loads only packages from its trust list.
- QSI data interface:
attenix qsi importandqsi exportexchange a model with programs that use the QSI data interface of DIN/TS 8998-1, the exchange format ISO 17534-1 refers to in Annex D: receivers, buildings, screens, terrain and ground areas, and sources as geometry only, since no method supplement of the standard covers the methods Attenix implements. What has no counterpart is reported.attenix rekenhart importmakes a study from an input file of RIVM’s Rekenhart geluid (road or rail traffic) or industry Rekenhart, andattenix imgeluid importfrom the IMGeluid files of the geluidregister. - Base data of an area:
attenix basedata 3d-geluidwrites the buildings, ground areas and terrain of an area from Kadaster’s 3D Geluid into a study,attenix basedata roadsthe roads with their traffic from a traffic model or count, with ready-made mappings for the Verkeersmodel Amsterdam, the Provincie Utrecht and Rijkswaterstaat’s INWEVA,attenix basedata railthe railway tracks with their traffic from the geluidregister or a file of your own, andattenix basedata featuresthe objects of a GIS layer of your own by a mapping of its columns; see Command line. - END delivery:
attenix end exportwrites the Dutch delivery of strategic noise maps under the Environmental Noise Directive, in the 2026 templates of RIVM’s Centrale voorziening geluidgegevens (Cvgg), for an agglomeration or for major roads: contours of CNOSSOS-EU grid results at 4 m in the END classes, clipped at the municipal or provincial border, and the exposure tables. The exposure is given by the user or computed by the engine by Bijlage XXXIII §2.6:attenix end import-dwellingsandimport-household-sizestake the dwellings of the BAG and the household sizes of CBS,end facade-pointsplaces receivers in front of the facades of the dwellings, andend exposuregives the dwellings and residents per Lden and Lnight class, counting only the dwellings within the map’s boundary, such as the municipality, when it is given; the export of an agglomeration with computed numbers requires it.attenix end checkchecks any delivery file offline, also one made by other software. Both are checked against the documented Cvgg checks of the 2026 manuals, and the export writes nothing when its check finds an error. - Export to AERIUS Calculator:
attenix aerius exportwrites the roads of a study (the lanes of Bijlage IVe and SRM II, the road lines of CNOSSOS-EU) with their vehicles per day as an IMAER file (IMAER 6.0) for AERIUS Calculator, which calculates the nitrogen deposition itself. The road type and the other attributes AERIUS needs come from optional columns of the road layer or from options; the rest of the study is left out and reported. An import of these files into AERIUS Calculator has not been tried yet, so that AERIUS Calculator reads them is not claimed. - Uncertainty:
attenix uncertainty sampleanduncertainty comparesupport the determination of uncertainty that ISO 17534-1 (§5.2.3) describes: a sample of receiver points, and the comparison of two calculations of it per indicator.
Built for speed
Exact and fast are not a trade-off in Attenix. Speed comes from how the calculation is organised, not from shortcuts in the method: the results are the same to the bit on one thread or on all of them.
- Every core: receivers are grouped into independent work units that run in parallel, and the per-path formulas run in SIMD instructions. Emission is calculated once per work unit, and the scene’s spatial index and terrain once per calculation.
- Only what changed: after an edit, incremental recalculation redoes only the receivers whose paths the edit can reach; a change of traffic adds up the kept sound paths again when they were small enough to keep, and otherwise calculates the receivers it reaches again.
- Kept fast: benchmarks of every hot path and of end-to-end reference scenes run against a stored baseline; a change that makes a reference scene more than 10 % slower is reported as a regression.
- Large files in Studio: a large height model has its display built once, in the background while Studio stays usable, and opens from the display cache after that. A study with more than 100 000 roads stays smooth to edit.
- Several computers: since 0.4.0 Attenix shares one calculation among several computers in
your network, and the parts are joined into one run that is bit-identical to a calculation on one computer.
See Calculating on several computers and
attenix queue serve.
What Attenix does not cover
So that nobody plans around a feature that does not exist yet:
- Other sources: emission is implemented for road traffic, for railway and tram traffic (Bijlage IVf and CNOSSOS-EU) and for industry (Bijlage IVh and CNOSSOS-EU). Aircraft noise is not covered.
- Other countries: of the national adaptations of CNOSSOS-EU, only the Dutch one (Bijlage XXXIII) is implemented.
- Limits: the engine 0.4.0 and Studio 0.4.0 assess against the standard values and upper limits of the Besluit kwaliteit leefomgeving for a new noise-sensitive building, for a new municipal road, water-board road or local railway and for the change of such a road or railway, and against limits you give per receiver.
- Nitrogen deposition: Attenix does not calculate it. It exports the roads of a study for AERIUS Calculator, which does.
- Attenix Studio: Studio does not search for screen heights by itself: Try screen heights checks the heights you choose.
- RMG 2012: of the method before the Omgevingswet, only Standaardrekenmethode 2 for road traffic is implemented.
- Bijlage XXXIII for 2027:
cnossos-eu.road.nl@2027follows a proposal, not a text in force. - Release terms: the date of a release for general use, licensing and prices are not yet announced.